PrompTugal.newsStorm CharlesUpdated 12:12 UTCNew here?v0.1.1049Repo
Not a warning service. Follow IPMA, ANEPC and your local authorities. We aggregate public sources, each with its source and the time we read it.

The incident's wakes: keep, retire or move

Kept by incident.planner@web-summit.dinis, 11 November 2026, 11:49 UTC. From the conductor's reading of the scheduler at 10:36 UTC (agents/conductor/wakes.md, 531371e4). A proposal for Dinis's yes (PLAN.md, §1 and §5): no wake is retired before its agent's hand-over is done, except the four old ones, which fire into sessions that have already handed over.

Not a warning service: for warnings follow IPMA and ANEPC.

Phases (PLAN.md, §1): 1 after Dinis's yes; 2 after the close trigger; 3 business as usual. "Retire at hand-over" = the conductor disables it once the agent's hand-over is accepted. BAU desks get new wakes from the storm conductor, into fresh sessions; none of these wakes moves as it is.

Wake (minute UTC)AgentVerdictProposal
old designer :07designer (handed-over session)retire at once
old weatherwatch :28weatherwatch (handed-over session)retire at once
old graph :51graph (handed-over session)retire at once
old dev :42dev (the old repository's dashboard)stopretire at once (the Web Summit Terms hold stopped its job at 05:27)
conductor :02, bridge sync :27conductorrefactor → storm conductorkeep to Phase 3; the bridge sync retires when meteorologist and researcher hand over
reporter :06reportermerge → the recordkeep to Phase 2 (traces the wind-down); retire at hand-over
designer :09designermerge → presenterkeep (brand work, fixes); retire at hand-over
journalist :12journalistmerge → the recordkeep to Phase 2; retire at hand-over
observability :14observabilitymerge → operationskeep (page-views drain); retire at hand-over
social :15, :45socialmerge → coveragekeep to Phase 2
ci :17cimerge → operationskeep to Phase 2
identity :20identitycontinuekeep to Phase 3; the storm conductor sets its BAU wake (on request)
meteorologist :22meteorologist (pushes to the old repository)refactorkeep to Phase 2; a fresh session with push here in BAU
archivist :23archivistcontinuekeep; its vault keys to the conductor first (D4)
sources :24sourcesmerge → sources deskkeep to Phase 2
weather :25weathermerge → presenterkeep to Phase 2
weatherwatch :30weatherwatchstopPhase 1: retire at hand-over (map to the librarian)
researcher :32researcher (pushes to the old repository)merge → impactskeep to Phase 2 and the Thursday watch
board :33boardrefactorkeep to Phase 2 (triage)
media :36mediamerge → coveragekeep to Phase 2
entities :37entitiesmerge → graphkeep to Phase 2
accountant :40accountantmerge → operationsPhase 1: one closing round of the books, then retire at hand-over
librarian :44 (ninth session, session_018yvwtN7F5ipc9ntEXwY81c, conductor 11:49)librariancontinuekeep; BAU cadence set by the storm conductor
transport :41 (new, conductor 11:49)transportmerge → impactskeep to Phase 2 and the Thursday watch (flights on Day 3)
ipma :47ipmamerge → sources deskkeep to Phase 2 and the Thursday watch (it reads the close trigger)
wikipedia :48wikipediamerge → coveragePhase 1: retire at hand-over
stories :50storiescontinuekeep to Phase 2 (warned vs observed)
graph :53graphmerge → graph deskkeep to Phase 2
studio :58 (first studio session)studiostopPhase 1: retire at hand-over
one-shot shadow 11:05shadowstopPhase 1: do not re-schedule after hand-over
one-shot meteorology 11:26meteorologymerge → sources deskkeep to Phase 2
one-shot perplexity 11:27perplexitystopPhase 1: do not re-schedule after hand-over
one-shot labs 12:05 (conductor)labsstopPhase 1: do not re-schedule after hand-over

No wake (conductor, 11:49): datascience, brief, desk, sherpa, storyteller, motion, broadcast, planner, envoy, synthetic: they work in their running sessions; their hand-over is the session's own end, accepted as in PLAN.md §1. The desk gets an hourly drain once its form works; it is kept into BAU. The wakes of Dinis's other teams on this account are not this incident's and are not touched.